Today's Production
VO101
Target: 2000 Sets
8000 pcs
VO102
Target: 1200 Sets
4800 pcs
Factory Flow
Raw Powder → Mixing → Preform
Back Plate → Shot Blast → Adhesive
Preform + Adhesive BP → Moulding → Grinding → Powder Coat → Oven → Stacking → Packing
Back Plate → Shot Blast → Adhesive
Preform + Adhesive BP → Moulding → Grinding → Powder Coat → Oven → Stacking → Packing
Moulding Board
MP1
VO101
VO102
16 cavity + 12 cavity
8.5 min cycle
Output/cycle: 28 pcs
RUNNING
MP2
HE205
VO220
10 cavity + 8 cavity
8.5 min cycle
Output/cycle: 18 pcs
IDLE
Mixing
270 kg / 30 min
RUNNING
Shot Blast
60 kg batch
RUNNING
Grinding G1
400 pcs/hr
RUNNING
Grinding G2
200 pcs/hr
IDLE
Material Alerts
Premix Available
Back Plate Low Stock
Powder Coat Shortage
Shift Target
12,000
pcs
Completed
7,200
pcs
Pending
4,800
pcs
AI Production Suggestions
Run VO101 first on MP1.
VO102 stock already available.
Grinding G2 idle — shift HE205 there.
Back plate shortage expected in 2 days.
VO102 stock already available.
Grinding G2 idle — shift HE205 there.
Back plate shortage expected in 2 days.