Ceradrive Factory Control

V5 · Factory Floor Planning Panel

Today's Production

VO101

Target: 2000 Sets

8000 pcs

VO102

Target: 1200 Sets

4800 pcs

Factory Flow

Raw Powder → Mixing → Preform

Back Plate → Shot Blast → Adhesive

Preform + Adhesive BP → Moulding → Grinding → Powder Coat → Oven → Stacking → Packing

Moulding Board

MP1

VO101
VO102

16 cavity + 12 cavity

8.5 min cycle

Output/cycle: 28 pcs

RUNNING

MP2

HE205
VO220

10 cavity + 8 cavity

8.5 min cycle

Output/cycle: 18 pcs

IDLE

Mixing

270 kg / 30 min

RUNNING

Shot Blast

60 kg batch

RUNNING

Grinding G1

400 pcs/hr

RUNNING

Grinding G2

200 pcs/hr

IDLE

Material Alerts

Premix Available
Back Plate Low Stock
Powder Coat Shortage

Shift Target

12,000

pcs

Completed

7,200

pcs

Pending

4,800

pcs

AI Production Suggestions

Run VO101 first on MP1.

VO102 stock already available.

Grinding G2 idle — shift HE205 there.

Back plate shortage expected in 2 days.